Project Information
Project
Employer - Administration:
ÇEAŞ, Çukurova Elektrik
Project Category:
Dams and Water Structures
Date:
01.01.1987 - 01.01.1990
Location:
Turkiye-Türkiye
Project Description
PROYAPI participated in the SIR Dam and Hydroelectric Power Plant (HPP) project, located in Kahramanmaraş, providing engineering and consultancy services. Managed by Çukurova Elektrik (ÇEAŞ), the project commenced in 1987 and was completed in 1990. The SIR Dam was designed to enhance energy production, efficiently utilize water resources, and provide flood control, contributing significantly to Turkey’s energy infrastructure.