Preloader

Ünvan

Balgat Mahallesi, 1408. Cadde, No:2, 06520, Çankaya/Ankara/TÜRKİYE

Telefon

+90 312 287 46 65

E-poçt ünvanı

info@proyapi.com

Layihə Məlumatı

Project

SIR Dam and HPP Project

İşəgötürən - İdarə:

ÇEAŞ, Çukurova Elektrik

Layihə Kateqoriya:

Dams and Water Structures

Tarix:

01.01.1987 - 01.01.1990

Məkan:

Turkiye-Türkiye

Layihənin təsviri

PROYAPI participated in the SIR Dam and Hydroelectric Power Plant (HPP) project, located in Kahramanmaraş, providing engineering and consultancy services. Managed by Çukurova Elektrik (ÇEAŞ), the project commenced in 1987 and was completed in 1990. The SIR Dam was designed to enhance energy production, efficiently utilize water resources, and provide flood control, contributing significantly to Turkey’s energy infrastructure.

Oxşar Layihələr

img

Berke Dam and HPP

Baxış
img

Berke Dam and HPP

Baxış
img

Berke Dam and HPP

Baxış

Son Əlavə edilmiş Layihələr

img

Konya – Seydişehir High-Speed Railway Line Project

Baxış
img

Burdur – Antalya High-Speed Railway Line Project

Baxış
img

Sarajevo Smart Transportation Systems Project

Baxış
img

Kabul – Kandahar Road

Baxış
img

Rrogozhinë – Elbasan Road

Baxış